sandra vanscott: "been running really smoothly and ahead of it out there. been working day and night. rain and shine, or snow." you always have to be prepared. luckily the extra rain and snow we recieved didn't cause any damage to the bridge. kerrie koski: "got all of the water diversions out. also got all of the temporary structures that were in the river out." that was back in the first couple weeks of january. just in the nick of the time. construction sandra vanscott: "have you peeked, have you looked around? all the time. i go up on top of the parking garage and peeked down. taken pictures." curious. my photographer and i had to do the same. it's amazing how far we've come. the goal is still to open up in may. so far so good covering cone zone, angela schilling channel two news. and n-dot is continuing improvements on i-580 through washoe valley with a new bridge closure. the bellevue road bridge along with the northbound on and the southbond on and off ramps remain open. traffic to go north is being detuoured to alternative 395/bowers mansion road and